Friday, February 18, 2011

Andeslan: CV. INDO RESOURCES

Posted by andesland 5:51 AM, under | No comments

Andeslan: CV. INDO RESOURCES: "CV. INDO RESOURCES engaged in Mining Mineral Consultants Group A (coal), coal drilling at a depth..."

Monday, February 14, 2011

CV. INDO RESOURCES

Posted by andesland 9:10 AM, under | No comments


CV. INDO RESOURCES engaged in Mining Mineral Consultants Group A (coal), coal drilling at a depth of 200 meters, making full reports public inquiry pertambnagan power, mining exploration, exploitation report preparation, UKL / UPL, and report quarterly, semiannual and annual geological mapping and tofografi for coal mining region, making maps with the coordinates and complete maps, coal trading, coal transportation available from the stockroom, stockfile get to their destination CV sales. INDO RESOURCES
Consultant, exploration, mapping, trading
Street Durian No. 19 vilangges Sungai Pinang Muara Bungo
HP. 085274218459 Email: ahmadtarmizi@gmail.com and atyonjf4302@yahoo.co.id

Muara Bungo, December 24, 2010

Number: 040 / DIR-MC / AAA / XII / 08
Attachments: -
Subject: Land Exploration Offers KP

Dear,
Mr. President
COAL MINING COMPANY
In -
Places.

With Regards,

We would like to thank as much as possible for the trust you to us. With this we offer a plan of drilling (exploration) and mapping the location of minerals in group A (coal) of the Mining Exploration is in the region Bapan company, we hereby submit a bid drilling (exploration) with the following conditions:

A. General Specifications
"Total Number of Meters: 2000 meters
"Number of Points: 20 (four) points
"Inter-Point Distance: Max. 200 meters, in one block
"Depth: Max. 120 meters, N size, wire Line
"Source of water: Max. 500 meters

B. Specifications Capacitas Drilling Machine Unit
"Unit Engine: Siprima 200-ex, scadule steel pipeMasture Skit Base. Download portable Rig, Top Drive Full Hydraulic Power rotary table, rotary speed 400 800 rpm, Diessel Engine 3000 RPM / 25 HP, Capacity depth of 120 meters, N Size, Wire
Line System.
"Penetration: ± 15 Meters / 80 ° shift condition
"Core Barrel: N size Type Q-3 Series.
"Core Recovery: e 90% Normal.

C. Hours / Shift Work and Time
"Number of Shift: 1 Shift / day, 10 hours and 1 hour istitarat
"Number of Machines: 1 Unit SiPriMa ex-200
"Continuity: 95%

D. Offer Price
"Open Hole: Rp. 270 000, - per meter
"Corring: Rp. 350.000, - per meter
"Mob / Demobilization, 1 unit of a complete drilling machine to a location in the area of Bungo PP Rp. 5,000,000, - and tailored to the region

E. Payment Method
"Mobilization / Demobilization Unit Machinery and Equipment all fully paid when issued SPK
"If the contract of 500 meters be paid cash at the time of drilling equipment has arrived in the region Mr.
"If the contract is more than 500 meters then the payment could be 50% of the value of the contract. Payment Further work is paid at the time of Settlement.

Thus offering from us, for your attention and cooperation I have to say thank you.

Sincerely,
CV. Maju Cemerlang

Ahmad Tarmizi

Cc. Designation
1. Expert Team Coordinator Geological CV. Indo Resources in Muara Bungo
2. Mining Expert Team Coordinator CV. Indoresources in Muara Bungo
3. Expert Team Coordinator Exploration CV. Indo resources in Muara Bungo
4. Mapping Expert Team Coordinator CV. Indo Resources in Muara Bungo.
5. Archives.